Back to Projects
Mechanical2021·Royal Malaysian Navy

Auxiliary Propulsion System Overhaul

KD Ledang

Auxiliary Propulsion System Overhaul — KD Ledang

Project Overview

Major mechanical overhaul of the auxiliary propulsion system aboard KD Ledang. Scope included full gearbox disassembly, shaft alignment verification, seal and bearing replacement, and functional testing leading to full acceptance trials with the Royal Malaysian Navy.

Scope of Work

  • 01Auxiliary propulsion system full disassembly and inspection
  • 02Gearbox overhaul and bearing replacement
  • 03Shaft alignment and seal renewal
  • 04Full functional testing and acceptance sea trials

Gallery

Auxiliary Propulsion System Overhaul gallery image 1
Auxiliary Propulsion System Overhaul gallery image 2

Project Info

Vessel
KD Ledang
Client
Royal Malaysian Navy
Category
Mechanical
Year
2021

Tags

PropulsionNavalMechanicalOverhaul

Outcome

Propulsion system fully restored. Accepted by RMN after successful sea acceptance trials.

Discuss a Similar Project