Project Overview
Major mechanical overhaul of the auxiliary propulsion system aboard KD Ledang. Scope included full gearbox disassembly, shaft alignment verification, seal and bearing replacement, and functional testing leading to full acceptance trials with the Royal Malaysian Navy.
Scope of Work
- 01Auxiliary propulsion system full disassembly and inspection
- 02Gearbox overhaul and bearing replacement
- 03Shaft alignment and seal renewal
- 04Full functional testing and acceptance sea trials
Gallery


Project Info
- Vessel
- KD Ledang
- Client
- Royal Malaysian Navy
- Category
- Mechanical
- Year
- 2021
Tags
PropulsionNavalMechanicalOverhaul
Outcome
Propulsion system fully restored. Accepted by RMN after successful sea acceptance trials.
