Back to Projects
AutomationSelected Work·Royal Malaysian Navy

Auxiliary Propulsion Electrical & DAPS Renewal

KD Ledang

Auxiliary Propulsion Electrical & DAPS Renewal — KD Ledang

Project Overview

Renewal of KD Ledang's auxiliary propulsion electrical system and Dynamic Advance Position System. The work covered removal of the old system, design, fabrication, cable pulling, onboard installation, termination, testing, and commissioning.

Scope of Work

  • 01Renew APS with NORIS system
  • 02Renew DAPS with Kongsberg system
  • 03Remove old system and fabricate replacement panels
  • 04Pull new cables, install onboard, terminate, test, and commission

Gallery

Auxiliary Propulsion Electrical & DAPS Renewal gallery image 1
Auxiliary Propulsion Electrical & DAPS Renewal gallery image 2

Project Info

Vessel
KD Ledang
Client
Royal Malaysian Navy
Category
Automation
Year
Selected Work

Tags

APSDAPSNORISKongsberg

Outcome

Electrical propulsion controls and DAPS renewed, tested, and commissioned onboard.

Discuss a Similar Project